RSS Feed
Home
About CMA
Locations
pressroom
Contact Us
FOIA
Related Links
Site Map
Divider
Divider
Divider
Advanced Search
Divider

 


Agent Destruction Status
Agent Destruction Status Graph
Click Graph for Details

Divider
Tooele Multimedia
SIP Bar End Image News Releases Publications Multimedia Reports SIP Bar End Image
 

Photos

CAMDS railcar   CAMDS railcar    CAMDS railcar   CAMDS railcar   Community Covenant Signing   

Community Covenant Signing    Tooele CAC   Heel Transfer System    DPE   4.2-inch mortar  

Rinsate Collection System   Mortar Restart   Railroad ties   DCD Plants Willow Branches   Government Public Safety Summit  

Small mammals   Pre-demolition work   Pollution Abatement System Filtration System exterior   Unventilated Monitoring Test   Lakepoint Facility  

2010 Change of Command   Site Project Manager of the Tooele Chemical Agent Disposal Facility, Ted Ryba, talks with OPCW EC visiting members inside the front entry/processing area of the ATLIC facility.    Project Manager of the Tooele Chemical Agent Disposal Facility (TOCDF), Ted Ryba, talks with OPCW EC visiting members during a tour of the TOCDF.    Site Project Manager of the Tooele Chemical Agent Disposal Facility (TOCDF), Ted Ryba, and Ambassador Ahmet Üzümcü, Director-General of the OPCW talk during the tour of the TOCDF.   Area 10 Liquid Incinerator   

OPCW EW visiting members   Burrowing Owl Project Nests   Glove Box   Col. Mark Pomeroy   Work Force Transition Center  

Surveying least chub at DCD   Measuring least chub at DCD   CAMDS concrete sampling   OPCW EC visit members tour the Utah State Capitol Building   TOCDF Demolition begins  

TOCDF Closure work   TOCDF ECR – Before   TOCDF ECR – After   TOCDF ECV – Before   TOCDF ECV – After  

TOCDF LIC – BEFORE   TOCDF LIC – AFTER    TOCDF MPB – BEFORE   TOCDF MPB – AFTER   TOCDF Toxic Cubicle – BEFORE  

TOCDF Toxic Cubicle – AFTER   TOCDF Upper Munitions Corridor Before   TOCDF Upper Munitions Corridor – AFTER   Concrete pour for ECS   Pollution Abatement System Filtration System  

Explosive Containment Cubicle (ECC)   ONCS On-site containers to be recycled   First entry onto the ECR to officially begin the cutter machine operations.   Last ONC Move   Last TOCDF Ton Container  

Hooking up a ton container   Hooking up a ton container 2   Loading a ton container   Moving a ton container into the glove box   Projectile delivery 4  

Projectile delivery 1   Projectile delivery 2   Projectile delivery 3   Demolition of the Chemical Agent Munitions Disposal System (CAMDS) 1   Demolition of the Chemical Agent Munitions Disposal System (CAMDS) 2  

Demolition of the Chemical Agent Munitions Disposal System (CAMDS) 3   Demolition of the Chemical Agent Munitions Disposal System (CAMDS) continues   Demolition of the Chemical Agent Munitions Disposal System (CAMDS) continues   Demolition of the above-ground structures at CAMDS   Demolition of the above-ground structures at CAMDS  

Crews have begun installing the shoring needed to start deep foundation excavation at the Chemical Agent Munitions Disposal System (CAMDS)   Tooele Chemical Agent Disposal Facility worker Guy Aguilar watches as the last mustard ton container exits the Metal Parts Furance    2010 Change of Command   Burrowing Owl Project   Freedom rescued  

CSEPP exercise   Area Ten Liquid Incinerator   Guzzler   CSEPP at Tooele   CSEPP at Tooele  

Heel Transfer System    CAMDS railcar   Unloading an On-Site Container   Start of VX destruction at TOCDF   Last VX Rocket  

Last VX Rocket   Start of VX destruction at TOCDF   Start of VX destruction at TOCDF   Deseret Chemical Depot Wildlife   TOCDF Employee Thumbs Up  

TOCDF Ton Container   Start of VX destruction at TOCDF   TOCDF Sirens   TOCDF mustard sampling operations   Mustard sample  

Audio/Video

TOCDF Overview 2008   Nesting ground growing stronger   CAMDS Demo 3-5-2012 MPF PAS   Delivery and processing of the last lewisite agent-filled ton container   Overpacked mustard agent-filled projectile processing  

The last tray of 155 millimeter mustard-agent at TOCDF   The Deseret Chemical Depot storage lights are turned off for the last time   CAMDS Demolition begins   TOCDF Last Mustard Ton Container   Native Utah fish finds safe home at DCD  

TOCDF Demolition Begins   TOCDF closure activities: LPG tank removal   TOCDF demolition activities  

 


Print this Page